濟(jì)南誠耐金屬制品有限公司

濟(jì)南誠耐金屬制品有限公司

不斷發(fā)展技術(shù)力量、完善的設(shè)計(jì)服務(wù)團(tuán)隊(duì),真誠為您提供的服務(wù)

咨詢熱線
于經(jīng)理15194166167
15990909037

聯(lián)系我們

企業(yè)名稱:濟(jì)南誠耐金屬制品有限公司

聯(lián)系人:于經(jīng)理

電話: 15990909037

電話: 15194166167

地址:山東省濟(jì)南市歷城區(qū)小清河南路8288號(hào)

當(dāng)前位置:首頁 »資訊中心 » 行業(yè)動(dòng)態(tài)電梯門套安裝門套窗套工藝特點(diǎn)

電梯門套安裝門套窗套工藝特點(diǎn)

來源:http://yippyshippy.com/ 瀏覽:0發(fā)表時(shí)間:2023-12-13

一、電梯套、門套、窗套安裝前期工作:

1、 Pre installation work for elevator covers, door covers, and window covers:

安裝電梯套和門窗套前,應(yīng)先檢驗(yàn)預(yù)留門窗洞口的尺寸是否符合設(shè)計(jì)要求以及前道工序質(zhì)量是否能滿足安裝要求。墻面的基底是否符合作業(yè)條件,并應(yīng)在墻頂、墻面及地面抹灰工程完工后進(jìn)行。

Before installing elevator sleeves and door and window sleeves, it is necessary to check whether the size of the reserved door and window openings meets the design requirements and whether the quality of the previous process can meet the installation requirements. Whether the base of the wall meets the working conditions should be carried out after the completion of the wall top, wall, and floor plastering works.

二、電梯套、門窗套施工安裝流程:

2、 Construction and installation process of elevator sleeves and door and window sleeves:

1、電梯門套施工流程 :檢查安裝墻面、套口——定位與放線——檢查石塑線條和搭配側(cè)板——結(jié)構(gòu)膠涂點(diǎn)——安裝固定——清潔飾面

1. Elevator door frame construction process: Check and install the wall and sleeve opening - Positioning and laying out - Check the stone plastic lines and matching side panels - Apply structural adhesive points - Install and fix - Clean the surface

2、檢查安裝墻面、套口:檢查墻面和套口的安裝前提是否具備,檢查門套預(yù)留洞口尺寸是否符合設(shè)計(jì)要求,窗套檢查預(yù)留臺(tái)面是否符合尺寸。

2. Check the installation of walls and openings: Check if the installation prerequisites for the walls and openings are met, check if the size of the reserved opening for the door frame meets the design requirements, and check if the reserved countertop for the window frame meets the size.

20210219015751941.jpg

3、定位放線:根據(jù)設(shè)計(jì)要求,在實(shí)際位置做出基礎(chǔ)線,并保證整體方正。門套定位,壓框?qū)挾葢?yīng)保證余量尺寸一致。

3. Positioning and laying out: According to the design requirements, make the foundation line at the actual position and ensure the overall squareness. The positioning of the door frame and the width of the pressure frame should ensure consistent margin dimensions.

4、檢驗(yàn)石塑線條和側(cè)板:安裝前,檢查石塑線條和側(cè)板的尺寸、規(guī)格、加工質(zhì)量、特備零件的規(guī)格以及數(shù)量**符合設(shè)計(jì)及規(guī)范要求。

4. Inspection of stone plastic lines and side panels: Before installation, check that the size, specifications, processing quality, specifications, and quantity of special parts of the stone plastic lines and side panels meet the design and specification requirements.

5、結(jié)構(gòu)膠涂點(diǎn):在電梯套和門窗套所需的石塑線條和側(cè)板背部進(jìn)行結(jié)構(gòu)膠均勻打點(diǎn),間距為10-20CM為宜。

5. Structural adhesive application points: Apply structural adhesive evenly on the stone plastic lines and back of the side panels required for elevator sleeves and door and window sleeves, with a spacing of 10-20CM.

6、安裝固定:電梯套和門套安裝需對(duì)安裝部位量尺,處理接頭及轉(zhuǎn)角位置;設(shè)計(jì)無特殊要求,接頭應(yīng)成45°角;然后直接按照施工圖要求進(jìn)行上墻安裝。

6. Installation and fixation: For the installation of elevator sleeves and door sleeves, the installation site needs to be measured first, and the joint and corner positions should be processed; There are no special requirements for the design, and the joint should be at a 45 ° angle; Then proceed with wall installation directly according to the construction drawings.

7、清潔飾面:安裝完工之后撕去飾面的保護(hù)膜,用抹布和肥皂水對(duì)勾縫出進(jìn)行清潔處理。

7. Cleaning the finish: After installation is completed, remove the protective film from the finish and clean the joints with a cloth and soapy water.

三、電梯套、門套、窗套安裝質(zhì)量主控項(xiàng)目:

3、 Main quality control items for the installation of elevator covers, door covers, and window covers:

1、電梯套、門窗套制作安裝所使用材料的材質(zhì)、規(guī)格、花紋和顏色、材質(zhì)的防火性、膠粘劑的甲醛含量應(yīng)符合設(shè)計(jì)要求及***標(biāo)準(zhǔn)的有關(guān)規(guī)定。

1. The materials, specifications, patterns, and colors used for the production and installation of elevator sleeves and door and window sleeves, as well as the fire resistance of the materials and the formaldehyde content of the adhesive, should comply with the design requirements and relevant regulations of * * * standards.

2、石塑電梯門套的造型、尺寸和固定方法應(yīng)符合設(shè)計(jì)要求,安裝應(yīng)牢固。

2. The shape, size, and fixing method of the stone plastic elevator door frame should meet the design requirements, and the installation should be firm.

3、電梯套和門套表面應(yīng)平整、潔凈、線條順直、接縫嚴(yán)密、色澤一致,不得有裂縫、翹曲及損壞。

3. The surface of elevator and door covers should be flat, clean, with straight lines, tight joints, and consistent color, without cracks, warping, or damage.

四、電梯套、門套成品保護(hù):

4、 Protection of finished elevator and door frames:

安裝電梯門套時(shí)不得損壞墻面,不得用錘擊墻面和門窗框。應(yīng)注意保護(hù)已施工完的墻面、地面、頂棚和窗臺(tái)不受損壞,保持裝飾面層的潔凈。

When installing elevator door frames, do not damage the walls, and do not use hammers to hit the walls and door and window frames. Attention should be paid to protecting the completed walls, floors, ceilings, and window sills from damage, and maintaining the cleanliness of the decorative surface layer.